| worksite |
|
| builder |
|
| engineer |
|
| contractor |
|
| electrician |
|
| renovation |
|
| contract |
|
| estimate |
|
| bid |
|
| to build - built |
|
| to construct |
|
| to renovate |
|
| to remodel |
|
After receiving three estimates from different contractors, we signed a contract with the company that offered the best price.
The construction company submitted a bid of $25,000 to remodel our bathroom.
The contractor estimates the project will take six months.
The architect designed a beautiful modern house.
Rome wasn't built in a day.
Build bridges, not walls.
Built to last.
| foundation |
|
| roofing |
|
| flooring |
|
| frame |
|
| framing |
|
| drywall |
|
| sheetrock |
|
| insulation |
|
| to frame |
|
| to insulate |
|
| to install |
|
The foundation is made of reinforced concrete.
The foundation must be solid before we begin framing.
We need to call the electrician to install the wiring.
Install the insulation before putting up the drywall.
We need to order more plywood for the flooring.
| masonry |
|
| plumbing |
|
| ductwork |
|
| duct |
|
| stucco |
|
| plaster |
|
| tar |
|
The plumbing and ductwork are hidden behind the walls.
| to demolish |
|
| to weld |
|
| to plaster |
|
| to tile |
|
| to grout |
|
The contractor will demolish the old kitchen next week.
After installing the tiles, don't forget to grout the joints.
Measure twice, cut once!